Pauch-1
The implementation of the project at the Mars-Luzhniki site was the second major project for our team after the completion of work at the Mars-Stupino site. The engineering group of the MARS team deserves special attention, this is the first time we have met such a level of project management on the part of the Customer! The work on this project was quite capacious, since the installation was carried out in conditions of full operation of the factory. The timing of the work was scheduled literally by the minute in order to keep up with the replacement of the luminaires directly above this equipment during the cleaning of the production equipment. About 30% of all work was carried out by industrial climbers. The Dynalight automated lighting control system is used on this project. The cumulative savings after the modernization of the lighting system reached 65%. The work of our team was highly appreciated by the Customer.