Coca-Cola HBC

Project in numbers:

3,000 m²
Work site area
220 pcs.
Quantity of lighting fixtures installed
Coca-Cola Hellenic is an authorized partner of the Coca-Cola Company. Coca-Cola Hellenic started its activities in 2001, has a lot of beverage producing plants and over 70 distributor centers.
01
Design works
02
Electrical installation works
03
Supply lighting equipment
04
Services electrical laboratories

The works were carried out at the following sites:

Finished products warehouse;

Bottlery;

Inflation and storage workshop.

Project achievements:

On the projects implemented for Coca-Cola HBC, one of the first factories where innovative Philips - GreenPerform Highbay G3 luminaires were used was this factory. This luminaire is distinguished by a unique cooling system. Thanks to the through cooling fins, dust does not settle on the luminaire, respectively, the luminaire does not overheat in conditions when the Customer for some reason does not perform appropriate periodic maintenance of the luminaires (timely cleaning). This technical solution allows you to save the luminous flux declared by the manufacturer and the service life of luminaire.

The customer appreciated the work of our specialists at a high level.

 

The following equipment was used at this facility: