Services Projects Recommendations Contacts
Pepsico Holdings

Project in numbers:

20,000 m²
Work site area
571 pcs
Quantity of lighting fixtures installed
This beverage production plant is a large enterprise. Pepsi®, Mountain Dew®, Mirinda®, 7Up®, alcohol-free energy drinks: Adrenaline Rush®, Drive Me® and cold teas Lipton Ice Tea® are produced here on four production lines.

Pepsico is the world’s largest Pepsi bottling plant. The Customer entrusted us to ensure illumination in control points in accordance with the European Standard of 300 lx at any time of day and most energy efficient lighting system.
01
Design works
02
Electrical installation works
03
Supply lighting equipment
04
Services electrical laboratories
05
Automated control systems

The works were carried out at the following sites:

Production lines;

Finished products warehouse.

Project achievements:

Our specialists have developed and implemented a project to modernize the lighting system with an automated control system. The lights, motion and light sensors are integrated directly into the TTX400 busbar. In 2013, this lighting system was an absolute innovation. Pepsico Holdings LLC was one of the first companies to integrate this innovative solution in its production, which allowed the Customer to save up to 40% of the electricity consumed.

 

The following equipment was used at this facility:

TTX 400
TTX 400
IS 345 MX Highbay
IS 345 MX Highbay
Dynalite Interfaces
Dynalite Interfaces
PDTS
PDTS
DDBC120-DALI
DDBC120-DALI