United Parcel Service

Project in numbers:

3,500 m²
Work site area
173 pcs.
Quantity of lighting fixtures installed
The new-generation logistics center K-22 has the most up-to-date technical equipment, a large number of loading docks and charging stations. The height of its ceilings is sufficient for cargoes of almost any size, and the floor can bear huge loads.
01
Design works
02
Electrical installation works
03
Supply lighting equipment
04
Services electrical laboratories
05
Automated control systems

The works were carried out at the following sites:

Types of works performed at the facility

Project achievements:

All the work was carried out in a very short time to launch the facility by the deadline. The UPS engineering team provided support to our team during the project implementation process. The Customer appreciated the quality of the works produced by our specialists at the highest level.